Contents |
pt. 1. Washington Public Power Supply System bond default: who pays? -- pt. 2. Bonneville Power Administration spending and the Luce report on the Washington Public Power Supply System (WPPSS) -- pt. 3. Bonneville Power Administration direct acquisition of Washington Public Power Supply System (WPPSS) nuclear projects nos. 1, 2, and 3. |
Partial contents |
Recommendations for solutions to the major problems involving, or arising from the Washington Public Power Supply System -- Council criticizes BPA's conservation budget. |
General note | Distributed to some depository libraries in microfiche. |
General note | "Hearing held in Washington, DC, January 26, 1984"--Pt. 1". |
General note | "Hearing held in Washington, DC, March 12, 1984"--Pt. 2". |
General note | "Hearing held in Washington, DC, March 28 and August 2, 1984"--Pt. 3". |
General note | "Serial no. 98-48." |
General note | Item 1023-A, 1023-B (microfiche). |
Bibliography note | Includes bibliographical references. |
LCCN | 85601778 |
GPO item number | 1023-A, 1023-B (microfiche) |
Govt. docs number |
Y 4.In 8/14:98-48/pt.1- |